MINISTRY OF WATER AND SANITATION TENDER MARCH 2025
CENTRAL RIFT VALLEY WATER WORKS DEVELOPMENT AGENCY
(on behalf of LAKE VICTORIA NORTH WATER WORKS DEVELOPMENT AGENCY)
SPECIFIC PROCUREMENT NOTICE (SPN)
INVITATION FOR BIDS
PROGRAMME | KENYA TOWNS SUSTAINABLE WATER SUPPLY AND SANITATION PROGRAM (KTSWSSP) |
Construction of Malaba and Kiptogot-Kolongolo Water and Sanitation Last Mile Connectivity Project | |
Date | 25th February 2025 |
Loan No | 200200000501 |
IFB No | CRVWWDA/LVN/AFDB/KTSWSSP/W/LMC/MAL-KIPT/2024-2025 |
- This Invitation for Bids follows the General Procurement Notice (GPN) for this project that appeared in UN
Development Business Online on 31st March 2017. - The Government of Kenya has received Financing from the African Development Bank in various currencies
towards financing the Kenya Towns Sustainable Water Supply and Sanitation Program. It is intended that part
of the proceeds of this loan will be applied to eligible payments under the contract for “Construction of Malaba
and Kiptogot-Kolongolo Water and Sanitation Last Mile Connectivity Project” - Central Rift Valley Water Works Development Agency (CRVWWDA) on behalf of Lake Victoria North Water Works
Development Agency (LVNWWDA) now invites sealed bids from eligible bidders for execution of the above
project. - The scope of works includes but not limited to the following under one contract:
Malaba Water Supply and Sanitation Infrastructure
• Purchase and supply of consumer meters (Kent or approved Equivalent)
• Construction of 17.8 Km Distribution line to serve Khasolo School, Kocholia Hospital, Myanga, Malaba
town slaughter, and hospital.
• Construction of 5.4 Km Consumer connection lines.
• Construction of 1 No. 100m3 elevated pressed steel tank in Malaba Town
• Construction of 2 No. water kiosks
• Modification/protection works on the existing Ndakaru intake on Malakisi River
• Rehabilitation of Chesikaki intake, raw water gravity mains, t-works, and pipelines
• Rehabilitation of 3no. 50m3 masonry tanks at tingongara, and sirisia and 5 no. 100m3 masonry tanks at
kimama, tingongara,kimabore, sirisia, sibanga)
• Supplying, Installing, testing, and commissioning 1no. duty, and one standby hybrid surface water
pump.
• Construction of the main pipeline from the treatment plant to Cheptis direction 8.5Km long
• Construction of Kimama distribution pipelines1km Long
• Construction of Chemondi market – Tuikut line 1Km Long
• Construction of 4 km of sewer lines
• Construction of 1.66 km outfall sewer line from the waste stabilization ponds to river Malaba
• 200 consumer connections for sewerage system
Kiptogot – Kolongolo Water and Sanitation Infrastructure
• Construction of 13km of pipeline in HDPE from OD63 mm to OD 250mm.
• Construction of 5No. Water Kiosks
• 1Nr. Elevated Steel Tank 100m3
• 12 Nr. Water Points